Short Definition

Permit fees are the amounts paid to the municipality through the Balady platform for issuing construction permits and related certificates, calculated electronically according to the type of service and the project's area, use and location.

Overview

Permit fees are the amounts paid to the municipality through the Balady platform for issuing construction permits and related certificates, calculated electronically according to the type of service and the project's area, use and location. They cover permits for new buildings, restoration, demolition and adding or modifying building components, as well as certificates such as the occupancy certificate, and form part of the project's soft costs. In Saudi Arabia the building permit is applied for electronically on Balady: the owner authorizes a designing engineering office, which prepares the designs; these are reviewed by a technical inspector and then by the municipality, after which a supervising office and a building contractor classified on the platform are assigned. Requirements include an updated electronic deed, a survey decision for building purposes, a soil study report, a traffic study where the activity requires it, and inherent defects insurance for non-governmental buildings. The designing office reviews the fees and issues the invoice, and the permit is neither valid nor printable until both the permit fees and the insurance policy are paid. Balady offers a fees calculator to estimate them in advance, so no single figure applies to all projects. In practice, many owners err by budgeting only for municipal fees. The real cost of permitting also includes the inherent defects insurance premium, design and supervision fees, the soil study and possibly a traffic study, with 15% VAT on services from registered suppliers. Building without a permit, or without a licensed supervising office and contractor, exposes the owner to fines and work stoppage, costing far more than the fees.

Legal Basis

Municipalities issue construction permits under the supervision of the Ministry of Municipalities and Housing via the Balady platform, and the fees are computed with the platform's fees calculator. The Saudi Building Code Implementation Law issued by Royal Decree No. (M/43) dated 26/4/1438H makes code compliance a requirement for building, restoration, alteration and change-of-use permits (Art. 6) and requires design, supervision and execution to be contracted to specialists holding practice licences (Art. 7). Council of Ministers Decision No. (509) dated 21/9/1439H obliges contractors in non-governmental projects to insure against inherent defects, and Balady requires the policy to be paid before the permit becomes valid. Building violations are subject to the Municipal Violations Penalties Regulation and the Building Code violations classification regulation.

Practical Example

Khalid plans a two-storey villa in Dammam with an expected construction cost of SAR 2,000,000 and set aside 4% (SAR 80,000) for permitting soft costs. The budget included design fees of SAR 35,000 plus 15% VAT, totalling SAR 40,250, a soil study of SAR 6,000, the inherent defects insurance premium as quoted by the insurer, and the municipal fees shown by the Balady calculator after entering the area and use, plus engineering supervision throughout construction. Once the permit fees and the insurance premium were paid, the permit became valid and the classified contractor started work with no risk of stoppage or fines.

Common Mistakes

  • ✗Relying on a figure passed around by word of mouth instead of the Balady fees calculator, although fees vary by service, area, use and location.
  • ✗Leaving the inherent defects insurance premium out of the budget, although the permit is not valid until it is paid.
  • ✗Contracting a builder not classified on the Balady platform, which blocks the permit.
  • ✗Starting excavation or construction before the permit is issued and valid, exposing the owner to fines and work stoppage.
  • ✗Forgetting that any later extension, alteration or change of use requires its own permit and fees.

International Differences

In the UAE, building permits are issued by bodies such as Dubai Municipality and free-zone authorities, each with its own fee schedule; in Turkey the owner pays a building permit fee to the municipality, calculated on floor area and building class; in Egypt permits are issued by districts and new-city authorities with varying fees. What is distinctive in Saudi Arabia is the unified electronic journey on the Balady platform and the link between permit validity and payment of the mandatory inherent defects insurance, a link rarely seen in neighbouring markets.

FAQs

How can I know the building permit fees before applying?▾
The Balady platform offers a fees calculator that estimates the amount by service type, area, use and location. The designing engineering office shows the final fees and issues the invoice during the application.
Is the building permit valid as soon as the municipal fees are paid?▾
No. The permit is not valid or printable until both the permit fees and the inherent defects insurance policy are paid. The policy is issued within the Balady application journey.
What documents does a Balady building permit require?▾
They include an updated electronic deed, a survey decision for building purposes, contracts with a designing office, a supervising office and a classified contractor, a soil study report and inherent defects insurance. A traffic study is required where the activity calls for it.
Are permit fees part of the project cost?▾
Yes. They are soft costs together with design and supervision fees, the soil study and insurance. They should be included in the feasibility study and financing from the outset.
What happens if I build without a permit?▾
The owner faces fines under the Municipal Violations Penalties Regulation, work stoppage and possibly removal of the violating works. Fines also apply to building without a licensed supervising office or contractor under the building code violations regulation.

In Other Languages

Arabic
رسوم التراخيص

رسوم التراخيص هي المبالغ التي تُدفع للأمانة أو البلدية عبر منصة بلدي مقابل إصدار الرخص الإنشائية وما يتبعها من شهادات، وتُحتسب إلكترونياً بحسب نوع الخدمة ومساحة المشروع واستخدامه وموقعه.

English
Permit Fees

Permit fees are the amounts paid to the municipality through the Balady platform for issuing construction permits and related certificates, calculated electronically according to the type of service and the project's area, use and location.

Turkish
Lisans Ücretleri

Ruhsat ücretleri, inşaat ruhsatları ve ilgili belgelerin düzenlenmesi karşılığında Balady platformu üzerinden belediyeye ödenen ve hizmet türüne, projenin alanına, kullanımına ve konumuna göre elektronik olarak hesaplanan tutarlardır.

Related Terms

Amlakire

About Amlakire

Amlakire is an integrated Saudi real estate management system, supporting agencies and owners in managing rentals, maintenance, and reports with high efficiency, preparing lease data for documentation on the Ejar platform, and compliant with Kingdom regulations.

Learn More→