Construction & Development

Milestone

Synonyms: Project Milestone، Payment Milestone، Key Date، Stage Completion

Last updated: 2026-09-25

Short Definition

A milestone is a specific event in the schedule that marks the completion of a phase or a key deliverable — such as completion of foundations, the frame, finishes or handover — and has no duration of its own; it is used to measure progress and report to the parties and is often linked to payments.

Overview

A milestone is a specific event in the schedule that marks the completion of a phase or a key deliverable — such as completion of foundations, the frame, finishes or handover — and has no duration of its own; it is used to measure progress and report to the parties and is often linked to payments. Unlike an "activity", which takes time, a milestone is a point of achievement rather than a period of work. In Saudi Arabia, linking payments to milestones has a legal basis: the Civil Transactions Law provides that where the work consists of several parts or the price is set per unit, the employer must pay the contractor in proportion to what has been completed after inspection and acceptance, provided the completed part is distinct or significant. In off-plan sales, milestones become part of the protection system: the model contract prepared by REGA includes the payment schedule, buyers pay into the escrow account, and funds are released only against a disbursement document signed by the developer, the consulting office and the chartered accountant stating the amounts and their justification, with completion certificates uploaded to REGA's project database. One of the key statutory milestones is the "completion certificate" at the end of the project, after which the chartered accountant retains 5% of construction cost in the escrow account (or a bank guarantee for the same percentage) for one year from project completion, unless the developer provides inherent defects insurance. Defining milestones with clear acceptance criteria reduces disputes over whether a stage has really been completed.

Legal Basis

Art. 469 of the Civil Transactions Law (M/191 dated 29/11/1444H) provides for payment on handover of the work unless otherwise agreed, and for payment in proportion to what has been completed after inspection and acceptance where the work is in parts or priced per unit. For off-plan sales, the Off-Plan Law (M/44 dated 10/3/1445H) provides that escrow disbursements are made against a document signed by the developer, the consulting office and the chartered accountant (Art. 11), and that 5% of construction cost is retained after the completion certificate for one year from project completion, or a bank guarantee or inherent defects insurance is provided instead (Art. 14). The implementing regulations require the payment schedule in the model contract (Art. 20), uploading of completion certificates to the database (Art. 23) and govern the disbursement document (Art. 27).

Practical Example

A buyer purchases an off-plan flat in Jeddah for SAR 900,000 with a milestone-based payment schedule: 10% on signing (90,000), 25% on completion of the concrete frame (225,000), 25% on completion of blockwork and services (225,000), 25% on completion of finishes (225,000) and 15% on handover (135,000). Each payment goes into the escrow account with a reference number that includes the unit number, and the developer can draw funds only with a disbursement document certified by the consulting office, after verifying the stage is complete, and by the chartered accountant. When the developer declared the frame complete although the top-floor slab had not been poured, the consultant refused to sign and the release was delayed by two weeks.

Common Mistakes

  • ✗Linking payments to calendar dates instead of to actual, verifiable progress.
  • ✗Defining milestones vaguely, such as "end of frame", without acceptance criteria and inspection records.
  • ✗An off-plan buyer paying directly into the developer's account instead of the project's escrow account.
  • ✗Certifying a stage as complete without the signature of the consulting office or independent supervisor.
  • ✗Omitting a retention after completion to cover defect repairs.

International Differences

In the UAE, escrow funds for off-plan projects are released according to completion percentages certified by the consultant and the regulator, and in Turkey contractors are usually paid through periodic progress payments (hakediş) based on measured work. International contracts use milestones to link payments and sometimes to apply stage-specific delay damages. The Saudi system is distinctive in requiring a three-way signature (developer, consultant and chartered accountant) for escrow releases and a statutory 5% retention after completion.

FAQs

What is the difference between a milestone and an activity?▾
An activity is work that takes time, such as pouring slabs, while a milestone is a moment of achievement with no duration, such as declaring "concrete frame complete" after all its activities are finished.
Can the contractor claim payment at each stage?▾
If agreed, or if the work consists of distinct parts or is priced per unit, the contractor is paid for what has been completed after inspection and acceptance; otherwise the default is payment on handover.
How are buyers' payments released in off-plan sales?▾
They are deposited in a project escrow account and released only against a disbursement document signed by the developer, the consulting office and the chartered accountant stating the amounts and their justification.
What is the completion certificate and why does it matter?▾
It evidences completion of the project; afterwards, 5% of construction cost is retained in escrow for one year, or a bank guarantee for the same percentage or an inherent defects insurance policy is provided.
What is the best way to define milestones in a contract?▾
Tie each milestone to a tangible deliverable, a clear acceptance criterion and an inspection record signed by the supervisor, and state the payment percentage and any retention.

In Other Languages

Arabic
نقطة الإنجاز

نقطة الإنجاز هي حدث محدد في الجدول الزمني يمثل اكتمال مرحلة أو مخرَج مهم في المشروع — مثل انتهاء الأساسات أو الهيكل الخرساني أو التمديدات أو التشطيبات أو الاستلام — وليس لها مدة زمنية بذاتها، وتُستخدم لقياس التقدم وإبلاغ الأطراف، وكثيراً ما تُربط بها الدفعات المالية.

English
Milestone

A milestone is a specific event in the schedule that marks the completion of a phase or a key deliverable — such as completion of foundations, the frame, finishes or handover — and has no duration of its own; it is used to measure progress and report to the parties and is often linked to payments.

Turkish
Dönüm Noktası

Kilometre taşı (dönüm noktası), takvimde bir aşamanın veya önemli bir çıktının — temellerin, iskeletin, ince işlerin veya teslimin tamamlanması gibi — bittiğini gösteren, kendi süresi olmayan belirli bir olaydır; ilerlemeyi ölçmek ve taraflara raporlamak için kullanılır ve sıklıkla ödemelere bağlanır.