Finishing

Synonyms: Finishes، Finishing Works، Fit-out، Architectural Finishes

Last updated: 2026-09-25

Short Definition

Finishing is the final stage of construction that follows completion of the structure and main services, covering plaster, paint, flooring, suspended ceilings, doors and windows, sanitary and electrical fittings and façade cladding, turning the building from a shell into a usable unit.

Overview

Finishing is the final stage of construction that follows completion of the structure and main services, covering plaster, paint, flooring, suspended ceilings, doors and windows, sanitary and electrical fittings and façade cladding, turning the building from a shell into a usable unit. Finishing quality largely determines first impressions, the sale price or rent, and later maintenance costs. The Saudi market uses terms such as "athm" (shell) for a structurally complete building without finishes, and "full finishing" or "turnkey" for a ready-to-live unit, with varying specification levels. The Civil Transactions Law requires a contractor who supplies materials to ensure they meet the agreed conditions and specifications, or are fit for purpose according to custom where none were specified. In off-plan sales, the developer must execute the project according to the specifications agreed in the contracts and feasibility study, and the implementing regulations provide that the chartered accountant may not release the escrow retention if defects in construction or finishing are shown by a licensed expert's report; REGA may use the retention to repair defects if the developer does not start repairs within five days of notice. Building-code requirements also shape finishing choices, such as thermal insulation, energy-efficient glazing and fire-resistant finishing materials. A building may not be occupied until the occupancy certificate is issued after compliance with the code is confirmed, so completing finishes and accepting them with a detailed snagging record is a decisive step before handover.

Legal Basis

Art. 463 of the Civil Transactions Law (M/191 dated 29/11/1444H) requires a contractor who supplies materials to ensure they meet the agreed conditions and specifications or are fit for purpose according to custom, and Art. 465 requires completion in line with the contract terms and accepted practice. For off-plan sales, Art. 14 of the Off-Plan Law's implementing regulations obliges the developer to build to the agreed specifications and give buyers the as-built drawings, and Art. 31 prohibits releasing the retention if construction or finishing defects are established by a licensed expert's report, allowing REGA to extend the retention by six months and use it for repairs. The Saudi Building Code Implementation Law (M/43) prohibits occupying a building without an occupancy certificate (Art. 9).

Practical Example

A buyer takes delivery of an off-plan flat in Al Khobar bought for SAR 780,000. At the pre-handover inspection he brings an engineer to prepare a snag list, which reveals a bathroom floor slope that causes ponding, uneven paint colour and windows of a lower grade than the contract specifies. He submits a licensed expert's report to the developer, and the chartered accountant withholds release of the project retention until repairs are done. The developer starts repairs within five days of REGA's notice and replaces the windows at its own cost of about SAR 14,000, after which both parties sign a final acceptance record.

Common Mistakes

  • ✗Contracting for "premium finishing" without a specification schedule stating brands, grades and quantities for each item.
  • ✗Accepting the unit without an engineering inspection and a signed snag list, weakening later claims.
  • ✗Doing finishes before testing plumbing, electrical and waterproofing, then breaking tiles to fix them.
  • ✗Choosing cheap materials that do not meet the building code's thermal-insulation or fire requirements.
  • ✗Confusing visible finishing defects, recorded at handover, with hidden defects that appear later.

International Differences

In Egypt, units are commonly sold "semi-finished" or "core and shell" for buyers to complete themselves; in Turkey, most new flats are delivered fully finished with a technical specification (teknik şartname) in the contract; and in the UAE, units are usually handed over finished with a defects warranty period. In Saudi Arabia, levels range from "athm" (shell) to turnkey, and off-plan sales are distinctive for a statutory retention mechanism that blocks release of the guarantee when finishing defects are established.

FAQs

What is the difference between shell, finishing and turnkey?▾
A shell (athm) is a structurally complete building without finishes; finishing covers plaster, paint, flooring and fittings; and turnkey means a fully finished unit ready to live in on delivery.
How can I protect myself from poor finishing in off-plan flats?▾
Ask for a detailed specification schedule in the contract, inspect the unit before handover with an engineer and record snags in writing; the regulations bar releasing the retention if finishing defects are established by a licensed expert's report.
May I refuse handover if finishing does not match the contract?▾
The buyer may demand execution according to the agreed specifications; it is usually better to record the defects in a handover report and require repairs before final acceptance than to refuse outright.
Who is responsible for materials the contractor supplies?▾
The contractor is responsible for their conformity with the agreed conditions and specifications, or for their fitness for purpose according to custom if no specifications were set.
Does the building code affect finishing materials?▾
Yes. The code's energy-conservation and fire-protection requirements affect the choice of insulation, glazing and finishing materials, and the building may be occupied only with an occupancy certificate after code compliance is confirmed.

In Other Languages

Arabic
التشطيب

التشطيب هو مرحلة الأعمال النهائية في البناء التي تلي إنجاز الهيكل الإنشائي والتمديدات الأساسية، وتشمل اللياسة والدهانات والأرضيات والأسقف المعلقة والأبواب والنوافذ والأدوات الصحية والكهربائية وتكسية الواجهات، وتحوّل المبنى من هيكل إلى وحدة صالحة للاستخدام.

English
Finishing

Finishing is the final stage of construction that follows completion of the structure and main services, covering plaster, paint, flooring, suspended ceilings, doors and windows, sanitary and electrical fittings and façade cladding, turning the building from a shell into a usable unit.

Turkish
Bitirme

İnce işler (bitirme işleri), taşıyıcı sistem ve ana tesisat tamamlandıktan sonra gelen ve sıva, boya, zemin kaplaması, asma tavan, kapı ve pencereler, sıhhi ve elektrik armatürleri ile cephe kaplamasını kapsayan; binayı kaba yapıdan kullanılabilir bir birime dönüştüren son inşaat aşamasıdır.

Related Terms

Amlakire

About Amlakire

Amlakire is an integrated Saudi real estate management system, supporting agencies and owners in managing rentals, maintenance, and reports with high efficiency, preparing lease data for documentation on the Ejar platform, and compliant with Kingdom regulations.

Learn More→