Real Estate Financing

Amortization Schedule

Synonyms: Repayment Schedule، Amortization Table، Installment Schedule

Last updated: 2026-09-25

Short Definition

An amortization schedule is a table showing every installment of a financing with its due date and amount, how it splits between profit (term cost) and principal, and the balance remaining after each installment, until the balance reaches zero at the end of the term.

Overview

An amortization schedule is a table showing every installment of a financing with its due date and amount, how it splits between profit (term cost) and principal, and the balance remaining after each installment, until the balance reaches zero at the end of the term. In Saudi Arabia the schedule is not just an illustration but a regulatory requirement: SAMA requires term cost to be spread over the financing period using the declining-balance method, meaning the profit in each installment is calculated on the principal outstanding at the start of that installment period. SAMA’s Guide for Calculating the Early Payment Amount (1436H) requires the amortization table to specify the number of payments, the date and amount of each payment, the term cost (profit) and principal in each payment, and the remaining balance after each payment, and the Implementing Regulation of the Real Estate Finance Law requires the contract to include the installment schedule. The schedule matters in practice: it is the basis for calculating the early-repayment amount (the outstanding balance plus compensation of no more than three months’ term cost), it explains why the profit share is large in the early years, and it reveals the effect of extending the term or making partial payments. With variable-rate financing the schedule changes at each recalculation, so the borrower needs an updated copy after every change.

Legal Basis

SAMA’s Guide for Calculating the Early Payment Amount dated 16/10/1436H (1 August 2015) and its key conditions (declining-balance method and contents of the amortization table); the Implementing Regulation of the Finance Companies Control Law (Art. 82: allocating term cost by the declining-balance method and stating it in the contract; Art. 78(10): installment amounts, number, duration and allocation method); and the Implementing Regulation of the Real Estate Finance Law issued by Minister of Finance Decision No. (1229) dated 10/4/1434H (Art. 9: mandatory contents of a real-estate finance contract, including the installment schedule).

Practical Example

Lamia has financing of SAR 500,000 over 20 years at a fixed 5% (illustrative figures), with an installment of about SAR 3,300. The amortization schedule shows that the first installment consists of about SAR 2,083 of profit and SAR 1,217 of principal, leaving a balance of about SAR 498,783. After 5 years (60 installments) the balance is still about SAR 417,274 even though she has paid nearly SAR 198,000, and after 10 years it is about SAR 311,108. When she decides to repay early after the 60th installment, the amount is taken from the schedule: the balance of about SAR 417,274 plus compensation of no more than the next three months’ term cost on the declining balance (about SAR 5,196), i.e. about SAR 422,470 — instead of paying about SAR 176,700 of remaining profit had she continued to the end.

Common Mistakes

  • ✗Not requesting or reviewing the amortization schedule at signing, although it is the basis for any early-repayment calculation.
  • ✗Assuming that halfway through the term half the principal has been repaid, when the balance is much higher because profit is concentrated in early installments.
  • ✗Not asking for an updated schedule after each variable-rate recalculation or after any partial payment or modification.
  • ✗Confusing total installments paid with the remaining balance when negotiating a sale or refinancing.
  • ✗Accepting a calculation method that is not declining-balance, which breaches SAMA’s instructions.

International Differences

Declining-balance amortization schedules are the global norm in home finance, and disclosure rules in the United States and Europe require borrowers to receive cost and installment information before contracting. Some markets historically used front-loaded profit methods for consumer loans. In Turkey and the UAE banks usually provide a repayment plan with the contract. The Saudi framework is distinctive in prescribing the schedule’s contents in writing and linking it directly to the early-repayment calculation.

FAQs

What must an amortization schedule include in Saudi Arabia?▾
Under SAMA’s guide: the number of payments, the date and amount of each payment, the profit and principal in each payment, and the principal balance remaining after each payment.
Why is profit so high in the early installments?▾
Because profit is calculated on the outstanding balance using the declining-balance method, and the balance is highest at the start, so the profit share falls and the principal share rises with each installment.
How is the schedule used for early repayment?▾
The outstanding balance is taken from the schedule on the repayment date, plus compensation of no more than the next three months’ term cost on the declining balance and any documented, non-refundable third-party costs.
Does the schedule change with variable-rate financing?▾
Yes. Installments and their allocation are recalculated at each change in term cost, and finance companies must notify the borrower of the new installments at least two months before they apply.
Is the declining-balance method mandatory?▾
Yes. The Implementing Regulation of the Finance Companies Control Law and SAMA’s guide require term cost to be allocated over the financing period using the declining-balance method.

In Other Languages

Arabic
جدول الإطفاء

جدول الإطفاء هو جدول يبين كل قسط من أقساط التمويل بتاريخ استحقاقه ومبلغه، وكيف يتوزع بين الربح (تكلفة الأجل) وأصل التمويل، والرصيد المتبقي بعد كل قسط، حتى يصل الرصيد إلى الصفر في نهاية المدة.

English
Amortization Schedule

An amortization schedule is a table showing every installment of a financing with its due date and amount, how it splits between profit (term cost) and principal, and the balance remaining after each installment, until the balance reaches zero at the end of the term.

Turkish
Amortisman Planı

Amortisman planı, bir finansmanın her taksidini vade tarihi ve tutarıyla, kâr (vade maliyeti) ile anapara arasında nasıl bölündüğünü ve her taksitten sonra kalan bakiyeyi, bakiye vade sonunda sıfıra ulaşana kadar gösteren tablodur.

Related Terms

Amlakire

About Amlakire

Amlakire is an integrated Saudi real estate management system, supporting agencies and owners in managing rentals, maintenance, and reports with high efficiency, preparing lease data for documentation on the Ejar platform, and compliant with Kingdom regulations.

Learn More→